HOME | NEWS |GROUP NEWS

GROUPNEWS

The Green Transformation from Dredged Waste to Construction Aggregate

Guided by the concept of green development, a comprehensive river dredging utilization project with a capacity of 500 tons per hour has been successfully operating for two years. This project innovatively transforms high-hardness river pebbles generated from dredging into high-quality sand and gravel aggregates, achieving a win-win situation for both ecological and economic benefits.

Addressing the challenges of high hardness, difficulty in crushing, and high clay content of the river pebbles, the project employs a wet process of “three-stage crushing + one-stage sand making,” coupled with a wastewater treatment system. This ensures the precise production of multi-specification aggregates while guaranteeing zero discharge and recycling of production wastewater, resulting in a finished product yield of approximately 93%.

The production line integrates intensification, green practices, and intelligence. The fully enclosed design effectively controls dust and noise; the intelligent system enables remote monitoring and operation, significantly reducing labor costs. For over two years, the project has continuously supplied a stable source of materials for local infrastructure construction, achieving the resource utilization of dredging waste.

<<Previous:Modern Crushing Equipment Drives Green and Intelligent Transformation of the Gold Mining Industry

<< It's the last one

Related News...

The Green Transformation from Dredged Waste to Construction Aggregate2025-12-27

Two Successes in Major Projects Demonstrate Industry-Leading System Integration Capabilities2025-11-14

700 tph crushing production line has been completed and put into operation in Angola2025-10-30

Multiple sand making machines aid hydropower station construction2025-08-29

Modern Crushing Equipment Drives Green and Intelligent Transformation of the Gold Mining Industry2025-12-27

Wheeled Mobile Crusher vs Tracked Mobile Crusher: Which is More Efficient?2025-11-28

Analysis of Investment Costs for Sand Making Production Lines2025-10-30

Three-Stage Tungsten Ore Crushing Line2025-10-01

Copyright © 2004-2015 by Fighter Corporation All rights reserved

Tel: 0086-13525565831    E-mail:info@limingco-group.com