HOME | CASE | High-efficiency and economical construction waste crushing production line configuration
High-efficiency and economical construction waste crushing production line configuration
Equipment: Jaw crusher, cone crusher, and vibrating screen combined mobile crushing station
Place of use: UAE
Processed material: Construction waste
Input size: 400mmOutput size: 0-5mm, 5-10mm,etc.
Capacity : 100-150 Tph
The core of construction waste treatment lies in multi-stage crushing, multi-stage screening, and multi-stage impurity removal to produce clean, high-quality recycled aggregate. A complete process flow typically includes the following key steps: pretreatment (feeding, soil removal, pre-sorting), crushing system (primary + secondary), screening and sorting system (iron removal, screening, air separation), and closed-loop circulation system.
The recycled aggregates produced by the production line, in sizes such as 0-5mm and 5-10mm, can be made into recycled bricks or precast components with performance comparable to natural stone, and can be directly used in road subbases, plaza paving, etc.
The mobile production line comes with its own chassis, allowing for a “one-click switch” from a fixed location to the demolition site, completely eliminating the long-distance transportation costs of construction waste. Once on-site, the equipment can be debugged and put into production within 2-3 hours, effectively handling municipal projects with tight deadlines.
The production line integrates specialized equipment such as electromagnetic separators and air separators to ensure efficient separation of impurities such as iron nails and sawdust from recycled aggregates, strictly guaranteeing the quality of the finished product.
NECESSARY PRODUCTS
Copyright © 2004-2015 by Fighter Corporation All rights reserved
Tel: 0086-13525565831 E-mail:info@limingco-group.com