HOME | CASE | 700t/d gold heap leaching and beneficiation production line configuration
700t/d gold heap leaching and beneficiation production line configuration
Equipment: Screen, hammer crusher, ball mill, leaching tank through, alloy pump, etc.
Place of use: Kazakhstan
Processed material: Gold ore
Input size: 150mmOutput size: Ore gradE 2.6g/t
Capacity : 700 tons per day
Gold is the only recoverable element in the project’s ore, grading 2.6g/t. Initially, the project client contacted Fighter and expressed strong interest after learning about our service model. Subsequently, the client visited our factory to further understand our mineral processing technology, further solidifying their decision to choose us. After extensive comparison and consideration, the two parties successfully reached a partnership agreement.
Our engineers designed a gold pool leaching process for this concentrator, driven by the principle of minimizing investment costs. This process is simpler and less expensive than carbon-in-place leaching, yet it meets the plant’s specific requirements. We also tailored the equipment to meet the plant’s specific requirements. The entire concentrator operates stably, with reliable equipment. The concentrator has achieved both expected performance and economic benefits, with an actual recovery rate of 85%.
NECESSARY PRODUCTS
Copyright © 2004-2015 by Fighter Corporation All rights reserved
Tel: 0086-13525565831 E-mail:info@limingco-group.com