HOME | CASE | 450 tph metal tailings crushing and processing production line in Kazakhstan
450 tph metal tailings crushing and processing production line in Kazakhstan
Equipment: C5X jaw crushers
Place of use: Kazakhstan
Processed material: Gold mine tailings
Input size: 300 mmOutput size: 40-50mm
Capacity : 450 tph
The reprocessing of gold mine tailings requires pretreatment to break down and crush the tailings. The client’s gold mine tailings had been deposited for a long time (40 to 50 years), forming hard lumps. Furthermore, Kazakhstan’s long, cold winters resulted in tailings with higher moisture content and hardness than typical tailings. The client also had high requirements for the output of the tailings pretreatment process. After analyzing the materials, climate, and client needs, Fighter’s engineers recommended our new crusher to the client.
Equipment Advantages:
1. Low wear and tear on the crusher, saving energy.
2. Adjustable toothed roller center distance enables forceful crushing of materials, accurately controlling product particle size and minimizing over-crushing. Therefore, it combines crushing and screening functions, simplifying the system and saving investment.
3. High crushing strength, large processing capacity, adjustable particle size rigidity, minimal over-crushing and over-grinding, and excellent crushing effect on sticky and wet materials.
4. Online automated central control system and intelligent automatic lubrication device ensure safe system operation.
NECESSARY PRODUCTS
Copyright © 2004-2015 by Fighter Corporation All rights reserved
Tel: 0086-13525565831 E-mail:info@limingco-group.com