HOME | NEWS |GROUP NEWS
300 t/d gold ore beneficiation production line
The CIL (Carbon In Leach) leaching process, that is, carbon leaching to extract gold, is a process that adds activated carbon to the slurry and simultaneously leaches and adsorbs gold, which reduces losses and management costs. Compared with the traditional CCD process, it saves 66% of investment costs and is the preferred process for modern gold mine beneficiation.

In the process of adding activated carbon, our specially selected imported coconut shell activated carbon (small holes, high activity, wear-resistant, renewable) is added to the slurry, which greatly improves the recovery rate of precious metals such as silver, copper and other associated metals, and significantly improves economic benefits.\r\n\r\nCompared with the CIP gold mining process and other traditional gold mining processes, our carbon leaching gold process greatly shortens the cyanidation operation time and reduces the capital backlog in the gold retention process.
Related News...
Iron Ore Crushing Project Completes Technical Upgrade2026-03-19
The Green Transformation from Dredged Waste to Construction Aggregate2025-12-27
Two Successes in Major Projects Demonstrate Industry-Leading System Integration Capabilities2025-11-14
700 tph crushing production line has been completed and put into operation in Angola2025-10-30
Technology and Equipment for the Resource Utilization of Construction Waste2026-03-04
Tunnel waste transformed into high-quality sand and gravel to support infrastructure construction2026-02-28
How does construction waste transform into high-quality recycled aggregate?2026-01-29
Smart Crushing Technology Enhances Global Metal Mining Efficiency2026-01-24
Copyright © 2004-2015 by Fighter Corporation All rights reserved
Tel: 0086-13525565831 E-mail:info@limingco-group.com