HOME | CASE | 2000 tons per day copper ore processing line
2000 tons per day copper ore processing line
Equipment: jaw crusher, cone crusher, vibrating screen, ball mill, flotation, etc.
Place of use: Chile
Processed material: copper ore
Input size: < 650mmOutput size: 200 mesh
Capacity : 2000 tons per day
To economically and efficiently develop low-grade mineral resources, a large copper mine in Chile has successfully invested in a modern mineral processing line with a daily processing capacity of 2,000 tons.
The crushing stage utilizes a three-stage, closed-circuit process. The jaw crusher, cone crusher, and vibrating screen work together to crush the raw ore to a particle size of 12mm, laying a solid foundation for subsequent grinding. The grinding stage utilizes a ball mill to grind the ore to a fineness of 200 mesh, effectively separating the copper minerals from the gangue.
The separation stage, the core step, utilizes a staged grinding and flotation process. Through a multi-stage process of roughing, concentrating, and scavenging, high-quality copper concentrate is successfully obtained.
The entire production line is equipped with a full-process automated control system to ensure stable and efficient production.
NECESSARY PRODUCTS
Copyright © 2004-2015 by Fighter Corporation All rights reserved
Tel: 0086-13525565831 E-mail:info@limingco-group.com