200 tons/day carbon leaching method for gold extraction production line

The CIL leaching process, which is the carbon leaching method for gold extraction, is a process that adds activated carbon to the slurry and simultaneously leaches and adsorbs gold. It simplifies the two steps of cyanide leaching the slurry and activated carbon adsorption into one step in the carbon slurry process. Reduce management costs while reducing losses.

Compared with the traditional CCD process, it saves 66% of investment costs and is the preferred process for modern gold mine beneficiation.\r\n\r\nCompared with the CIP gold mining process and other traditional gold mining processes, the Fighter carbon leaching gold process greatly shortens the cyanidation operation time and reduces the capital backlog in the gold retention process.\r\n\r\nTaking a 7.5g/t gold cyanide plant with a monthly processing capacity of 100,000 tons as an example, the CIL carbon leaching method saves investment costs of US$486,000 compared to the CIP carbon slurry method and reduces the backlog of gold retained in production by US$201,700. After deducting the additional activated carbon cost of US$12,600 in the process, US$675,100 was saved and recovered in advance.\r\n\r\nThe application of mineral processing methods and their combined processes varies with ore type. Welcome to contact online customer service to obtain production line configuration.

<<Previous:Hematite crushing and beneficiation production line

<<Next:Mobile crusher plays an important role in the construction waste treatment production line

Related News...

Multiple sand making machines aid hydropower station construction2025-08-29

Pebble Crushing and Sand Making Solutions2025-07-30

Sand and Aggregate Project Successfully Launched, Boosting Industry Efficiency2025-06-27

Intelligent stone crushing production line creates excellent sand and gravel production solutions2025-05-28

Crushing and Grinding Stages of a Large-Scale Copper Ore Concentrator2025-08-29

200t/h Granite Crushing Line for Aggregate Production2025-07-30

What equipment is needed for metal ore processing?2025-06-27

How to select stone crushing equipment in the production line?2025-05-28

Copyright © 2004-2015 by Fighter Corporation All rights reserved

Tel: 0086-13525565831    E-mail:info@limingco-group.com