HOME | CASE | 1,500 tons/day gold ore processing plant in Tanzania
1,500 tons/day gold ore processing plant in Tanzania
Equipment: PEW jaw crusher, ball mill, magnetic separator, flotation machine, gravity separator, dewatering equipment, etc.
Place of use: Tanzania
Processed material: Sulfide gold ore
Input size: 350 mmOutput size: Final grade 90% gold, 64% copper
Capacity : 1,500 tons/day
The project benefits from Fighter’s cutting-edge equipment and production solutions, ensuring high efficiency and optimal gold recovery through innovative processing techniques.
The facility has a designed capacity of 1,500 tonnes per day, allowing operations to be easily expanded to meet growing demand, allowing for flexibility in production and adaptability to market conditions. Our commitment to environmentally friendly practices ensures that this project has the smallest ecological footprint possible.
By creating jobs and improving local infrastructure, the project contributes to Tanzania’s overall economic growth and fosters positive relationships with local stakeholders.
NECESSARY PRODUCTS
Copyright © 2004-2015 by Fighter Corporation All rights reserved
Tel: 0086-13525565831 E-mail:info@limingco-group.com