Equipment: HST160 and HPT300 hydraulic cone crusher

Place of use: Congo

Processed material: Gold ore

Input size: 80 mmOutput size: Less than 12mm

Capacity : 100 tph

Chat OnlineLeave Message

The original crushing production line of the gold mine adopted a two-stage and one closed-circuit crushing process, and the finished product was smaller than 18mm. According to production requirements, in order to expand the scale and reduce the grinding particle size, our engineers designed a three-stage and one closed-circuit process. Our company’s single-cylinder hydraulic cone crusher HST160 and multi-cylinder hydraulic cone crusher HPT300 are selected to form a crushing production line.

The new processing technology enables the discharged material to be less than 12 mm, achieving a large amount of processing capacity and ideal product particle size for qualified products before entering the grinding machine. After a long period of production operation, the production capacity has greatly exceeded the original design expectations.

NECESSARY PRODUCTS

Copyright © 2004-2015 by Fighter Corporation All rights reserved

Tel: 0086-13525565831    E-mail:info@limingco-group.com