Gold ore beneficiation production line
The gold ore beneficiation production line is divided into crushing, grinding, flotation and other links. The equipment used is jaw crusher, ball mill, flotation machine, dryer, spiral classifier, vibrating screen and other equipment.
The jaw crusher is used for primary crushing of large pieces of gold ore mined. The ball mill is used to grind the crushed gold ore to fully dissociate the ore in order to achieve good flotation effects. The flotation machine is one of the key equipment in the gold ore beneficiation production line to obtain the final gold concentrate. The dryer is used to dry and dehydrate the gold concentrate after flotation.
The process flow of the gold ore beneficiation production line is relatively simple. First, large pieces of gold ore enter the jaw crusher for primary crushing. After being screened by the vibrating screen, the unqualified materials enter the jaw crusher for re-crushing, and the qualified gold ore will be sent to the ball mill for grinding processing. The ground slurry will be classified under the action of the spiral classifier. Similarly, only the slurry that meets the conditions can enter the mixing barrel and mix with the chemicals, and then stir thoroughly. Next, it is sent to the flotation machine to completely react between the minerals and the slurry, and then the gold concentrate can be obtained; then it is initially concentrated by the concentrator, and finally dried and dehydrated in the dryer to obtain the finished gold concentrate.
If you are interested in gold ore beneficiation production line, please click on the online customer service for a detailed consultation.
Related News...
Our professional team revisited the granite crushing and sand making project and was highly recognized by customers2024-11-28
Mobile Crushing Stations Increase Quarry Productivity2024-09-13
Upgrade of vanadium-titanium magnetite processing project2024-08-12
Lithium ore processing technology lithium ore dressing production line2024-07-15
Quartzite gold ore processing plant is put into operation efficiently in Zimbabwe2024-11-28
150-200tph granite crushing production line helps Tanzania’s infrastructure construction
100 TPH manganese ore selection crushing production line2024-11-25
Why are jaw crushsers popular in primary crushing in mines?2024-10-31
Copyright © 2004-2015 by Fighter Corporation All rights reserved
Tel: 0086-13525565831 E-mail:info@limingco-group.com