HOME | CASE | 50 tph copper ore beneficiation project in Myanmar
50 tph copper ore beneficiation project in Myanmar
Equipment: jaw crusher, cone crusher, ball mill, spiral classifier, flotation machine, vibrating screen, vibrating feeder, belt conveyor, etc
Place of use: Myanmar
Processed material: copper ore
Input size: 100 mmOutput size: 200 mesh
Capacity : 50 tph
The copper ore is sent to the jaw crusher through the vibrating feeder for primary crushing. After crushing, the copper ore is sent to the vibrating screen by the belt conveyor for screening, and then sent to the cone crusher for fine crushing by the belt conveyor. After fine crushing, the ore is screened again.
The crushed ore is sent to the ball mill for grinding by the belt conveyor, and then discharged to the spiral classifier for classification after grinding. Finally, the final qualified concentrate is obtained by sorting through the flotation machine.
NECESSARY PRODUCTS
Copyright © 2004-2015 by Fighter Corporation All rights reserved
Tel: 0086-13525565831 E-mail:info@limingco-group.com