2,000 tons per day gold cyanide beneficiation production line in West Africa

HOME | CASE | 2,000 tons per day gold cyanide beneficiation production line in West Africa

2,000 tons per day gold cyanide beneficiation production line in West Africa

Equipment: Crusher, ball mill, mixing tank, etc.

Place of use: West Africa

Processed material: Gold mine

Input size: 300 mmOutput size: 200 mesh

Capacity : 2,000 tons/day

Chat OnlineLeave Message

Project advantages

(I) EPC project general contracting service, saving effort and worry

The total contract price and construction period of the EPC project are fixed, and the investment and construction period are relatively clear, which is conducive to cost and progress control.

(II) Advanced technology and reliable equipment

Adopting advanced technology, mature technology, and reliable equipment, the overall production technology and process equipment are at an advanced level to ensure the efficient and stable operation of the entire project.

(III) Adapting to local conditions and smooth production

The design of the project is adapted to local conditions, the layout of the entire production site is compact and reasonable, and the production line is smooth and simple.

(IV) Green and environmental protection

The environmental protection design standards of the project are high, which greatly reduces the impact of the production line on the surrounding environment, and takes into account social benefits while pursuing economic benefits.

 