HOME | CASE | 2,000 tons per day gold cyanide beneficiation production line in West Africa
2,000 tons per day gold cyanide beneficiation production line in West Africa
Equipment: Crusher, ball mill, mixing tank, etc.
Place of use: West Africa
Processed material: Gold mine
Input size: 300 mmOutput size: 200 mesh
Capacity : 2,000 tons/day
Project advantages
(I) EPC project general contracting service, saving effort and worry
The total contract price and construction period of the EPC project are fixed, and the investment and construction period are relatively clear, which is conducive to cost and progress control.
(II) Advanced technology and reliable equipment
Adopting advanced technology, mature technology, and reliable equipment, the overall production technology and process equipment are at an advanced level to ensure the efficient and stable operation of the entire project.
(III) Adapting to local conditions and smooth production
The design of the project is adapted to local conditions, the layout of the entire production site is compact and reasonable, and the production line is smooth and simple.
(IV) Green and environmental protection
The environmental protection design standards of the project are high, which greatly reduces the impact of the production line on the surrounding environment, and takes into account social benefits while pursuing economic benefits.
NECESSARY PRODUCTS
Copyright © 2004-2015 by Fighter Corporation All rights reserved
Tel: 0086-13525565831 E-mail:info@limingco-group.com