120tph gold ore crushing line in Kazakhstan

HOME | CASE | 120tph gold ore crushing line in Kazakhstan

120tph gold ore crushing line in Kazakhstan

Equipment: PE600*900 jaw crusher, CSB160 cone crusher

Place of use: Kazakhstan

Processed material: gold ore

Input size: 500mmOutput size: 20mm

Capacity : 120T/H

Chat OnlineLeave Message

These are two gold crushing production lines with the same configuration. The project headquarters is the Chimkent, with mines in Turkestan and Ustinka, Myanogorsk, respectively. The technological process is simple and clear. Material enters jaw crusher for primary crushing and cone crusher for secondary crushing. The final product size is about 20 mm.

PE 600*900 Working Principle

The motor transmits power through belt, drives the moving jaw to do periodic motion towards the fixed jaw by the eccentric shaft. The angle between toggle plate and moving jaw plate increases when moving jaw moves . So the moving jaw moves towards the fixed jaw. The stuff will be crushed in this process. The angle between toggle plate and moving jaw decreases when moving jaw moves down, the moving jaw moves leaves fixed jaw by pulling rod and spring, the final crushed stuff will be discharged from the outlet.

NECESSARY PRODUCTS

Copyright © 2004-2015 by Fighter Corporation All rights reserved

Tel: 0086-13525565831    E-mail:info@limingco-group.com